Skip to Main Content
  • Linde Worldwide
  • The Linde Group
  • About Linde
  • Engineering
    Thailand

  • Welcome
  • About Linde Engineering
      • Management
        • Dr Christian Bruch
        • Juergen Nowicki
        • John van der Velden
        • Tilman Weide
      • Locations
        • Linde Engineering Dresden
        • Linde Engineering Schalchen Plant
        • Selas-Linde GmbH
        • Linde Kryotechnik AG
        • Cryo AB
        • Cryostar SAS
        • Linde CryoPlants Ltd.
        • Moscow Representative Office
        • Linde Engineering Rus, OOO
        • Linde Engineering North America Inc. - Tulsa, Oklahoma
        • Selas Linde North America
        • Hydro-Chem
        • Linde Engineering North America Inc. - Houston Office
        • Linde Engineering (Hangzhou) Co., Ltd.
        • Linde Engineering (Dalian) Co., Ltd.
        • Beijing Representative Office
        • Linde Arabian Contracting Co. Ltd.
        • Linde Engineering Middle East LLC
        • Linde Engineering Korea
        • Linde Engineering South Africa (Pty) Ltd.
      • Quality, Health, Safety & Environment (QHSE)
        • QHSE at construction sites
        • Certificates and awards
      • Collaborate.Innovate.Deliver.
        • Collaborate
          • Kickoff for mega project
          • Collaborate - Teaming up for success.
          • Providing efficient plant solutions for hydrogen gas
          • Cooperating for record recoveries
          • Producing LNG in the Arctic
          • Teaming up for optimum outcomes
          • Rescue plan for refinery
          • Teaming up for petrochemical projects
          • Coaching on construction sites
        • Innovate.
          • Recycling CO₂– the efficient way
          • The CO2-tolerant plant
          • Mid-scale is scaling out
          • The key to success
          • Hybrid process to recover helium
          • A virtual tour of Amur
          • 3D metal printing in plant engineering
          • Managing heat efficiently
          • New opportunities for CCS technology
          • Modular knows no limits
          • Virtual plant training
          • New all-round service for your plant
          • Lifetime optimisation of plate-fin heat exchangers
        • Deliver.
          • Powerful solutions for extreme conditions
          • High-quality paper thanks to oxygen
          • Ecosourcing raw CO₂
          • Supplying liquefied natural gas
          • Engineering defies permafrost
          • All-in-one package destined for Australia
        • The mega refinery
  • Process Plants
      • Air separation plants
        • Customised air separation plants
        • Modular air separation plants
        • Containerised air separation plants
        • References
      • LNG and natural gas processing plants
        • Liquefied natural gas (LNG)
          • World-scale LNG plants
          • Floating LNG production and storage
          • Small to mid-scale LNG plants
          • StarLNGL™
          • LNG terminals
          • Flat-bottom storage tanks
          • LNG fuelling stations
        • Natural gas liquids (NGL)
          • CRYO-PLUS™
          • NGL and LPG recovery
        • Nitrogen rejection
        • Helium recovery and liquefaction
        • References
      • Hydrogen and synthesis gas plants
        • Gas products
          • Hydrogen
          • Carbon monoxide
          • Synthesis gas
          • Ammonia
          • Methanol
        • Gas generation
          • Steam reforming
          • Partial oxidation
          • Tandem reforming
          • CO shift conversion
          • Isothermal reactor
        • Gas processing plants
          • Partial condensation process and liquid methane wash
          • Liquid nitrogen wash
          • Separation of hydrogen and LPG from refinery fuel gas
          • Rare gas processing
          • Acid gas removal and sulfur recovery
          • RECTISOL® wash
          • Purge gas recovery
            • Purge gas recovery. Your individual needs.
      • Petrochemical plants
        • Steamcracking technology
          • Cracking furnace technology
          • Ethylene separation technology
        • Acetylene recovery technology
        • Linear alpha olefins (LAOs)
          • α-SABLIN® technology
          • Recovering linear alpha olefins (LAOs)
        • Polyolefin plants
          • Polyethylene plants
          • Polypropylene plants
        • Third-party technologies
          • Aromatics plants
          • Downstream Petrochemicals
            • Reference Cologne
            • Reference 1 Riyadh
            • Reference 2 Riyadh
          • Polyolefin
        • Oxidative coupling of methane (OCM)
        • References
      • Adsorption and membrane plants
        • Membrane plants
        • Hydrogen recovery and purification
        • Oxygen generator plants
        • Nitrogen generation
        • Carbon dioxide removal and purification
      • Cryogenic plants
        • Helium liquefiers
        • Helium refrigeration plants
        • Hydrogen liquefiers
        • Helium recovery systems
        • Equipment and accessories
      • CCS and CO₂ plants
        • CCS plants
          • Post-combustion
          • Pre-combustion
          • Oxy-fuel combustion
          • CO₂ storage
        • CO₂ plants
          • Customised CO₂ plants
          • Modular LCO₂ plants
          • CO₂ purification and liquefaction questionnaire
        • References
      • Furnaces, fired heaters and incinerators
        • Steam reformer furnaces
          • HYDROPRIME® hydrogen generators using steam-methane reforming
        • Cracking furnaces for ethylene production
        • Cryogenic vaporiser
        • Fired heaters and waste heat recovery units
          • Process heat transfer
        • DRI heaters & special crackers
        • Incinerators and thermal oxidisers
          • Incinerators for gaseous and non-aqueous liquid wastes
          • Incinerators for aqueous waste streams
          • Flameless thermal oxidisers
  • Plant Components
      • Plate-fin heat exchangers (PFHEs)
        • Plate-fin heat exchangers – Design variants
      • Packaged units / coldboxes
      • Cryogenic columns
      • Coil-wound heat exchangers (CWHEs)
      • Cryogenic tanks
        • Customer Information Centre
      • Air-heated vaporisers
      • Water bath vaporisers
      • Spiral-welded aluminium pipes
      • Helium storage tanks
      • UN portable tank (Helicon)
      • Operational services
  • Services
      • LINDE PLANTSERV™
        • Plant modification and revamp
        • Spare part management
        • Maintenance and repair
        • Training
        • Support on plant operations
        • Case studies
          • Case study. Plant modification.
          • Case study. Spare part management.
          • Case study. Maintenance and repair.
          • Case study. Training.
          • Case study. Support on plant operations.
        • Contact
      • Engineering
        • Modularisation
      • Procurement
        • Supplier portal
          • Conditions of purchase
          • Linde Standards for suppliers
          • eAuctions
      • Construction
      • Export and project financing
  • Innovations
      • Virtual reality redefines plant engineering
      • Linde Pilot Reformer
      • Green hydrogen from biomass
      • Rare gas units
      • α-SABLIN® – Oligomerisation of ethylene to linear α-olefins (LAOs)
      • Heat exchangers for floating LNG (FLNG) plants
  • News & Media
      • Press Services
        • Interview Digitalisation
      • Press Releases
      • Linde @ Social Media
        • Facebook
        • Twitter
        • YouTube
        • Google+
        • LinkedIn
        • Miscellaneous
        • Social Media Guidelines
      • Events
        • Gastech 2018
        • Achema 2018
        • Nitrogen + Syngas 2018
        • Events Archive
          • The 10ᵗʰ Hydrogen and Syngas Symposium
            • Agenda
            • Videos
          • Gastech 2017
          • Achema 2015
            • Discover
            • Engage
            • Experience
            • Stack up
            • Network
          • Downstream Tatarstan
      • Publications
      • Linde Apps
        • Investor Relations App
        • BeeZero App
        • C-Pot
        • Gas Converter
        • Gas distribution partner-search
        • Fascinating Gases
        • Virtual World
        • Virtual Cryo
        • BOC re-order
        • Afrox Shop
      • Image Library
      • Video Library
      • Media Contacts
  • Careers
      • Work @ Linde
      • People @ Linde
        • License to Fill
        • Matthias & the Mechanics
        • The Pathfinder
        • Giving Back
      • Roles @ Linde
        • Engineers & Technicians
        • Sales & Customer Service
        • Healthcare & Homecare
        • Corporate Functional Staff & Admins
        • Operational Staff, Fillers & Drivers
      • Jobs @ Linde
        • Locations worldwide
      • Students & Graduates
        • School Students
        • University Students
        • Graduates
      • Apply @ Linde
      • Job Blog
        • A Dream Job
        • A New Home
        • Insider Tips
        • Shell Eco-marathon
        • Shell Eco-marathon London
        • Shell Eco-marathon: Driving change
        • A whole new weld
        • Mission: Impossible
        • Into the future: at the push of a button
        • Get with the programme
        • Shell Eco-marathon: Learning from the young
  • Contact & Support
      • Contact
      • Route Planner
  •  
  • Linde Worldwide
  • The Linde Group
  • About Linde
  • About Linde Engineering
  • Collaborate.Innovate.Deliver.
  • Collaborate
  • Rescue plan for refinery
Oil refinery industry plant

Rescue plan for refineryLinde assists Unipetrol following major accident

On August 13, an exceptional situation occurred on the premises of Unipetrol, the Czech Republic’s largest crude oil processor. The cause of the event was an irregular episode with one of the emergency safety valves located in the steam cracker. Despite its great intensity, the resulting fire was extinguished after five hours thanks to Unipetrol’s immediate reaction and close cooperation between internal and public fire rescue services. And while the situation in the North Bohemian town of Litvínov, where the chemical complex is located, was calming down and refinery workers were assessing the damage, a plan for the fast and safe recovery of the damaged production unit was already being drafted.


"3 days after incident the first
Linde experts arrived on site."


Rebuilding the steam crackers

“As soon as we learned about the accident through the media, we contacted Unipetrol to offer our repair services,” explains Dr Detlef Kracht Project Manager at Linde Engineering in Dresden. Although Linde did not build the original steam cracker in 1980, it did a revamp in 2007. As such, Kracht and his team were already very familiar with the plant layout. In addition, the two companies had collaborated on projects in the past. This was undoubtedly one of the reasons why Unipetrol involved Linde in the damage assessment process in September and then awarded Linde the EPC (engineering, procurement and construction) contract in early October 2015 to rebuild key sections of the damaged plant. “We inspected the site just three days after the explosions, once the fire-fighters had declared it safe to do so,” recalls Kracht.

CAD drawing of the polypropylene plant in Tobolsk, Western Siberia/Russia. Should you want to use this picture, please get in touch with Linde Engineering Communications via le.communications@linde-le.com. Please note: The graphic must not be used below 10% of the original size.

Example of a polypropylene plant in Russia


An elaborate safety concept

The large number of contractors involved had to be jointly managed by Unipetrol and Linde Engineering. Both knew that the only way to guarantee a smooth workflow was to closely align concepts and timelines. The biggest challenge, however, lay in developing and coordinating a safety policy for the plant so that workers would not be exposed to danger. “It was vital to make the plant safe, for example by setting up scaffolding, securing areas in danger of collapsing, getting rid of live wires and eliminating hydrocarbons from pipelines,” explains Kracht. “We carried out thorough inspections of each unit and the working conditions before embarking on every new stage of the project. It was definitely more of a parallel process than you would find when constructing a plant from the ground up,” comments the Linde expert. A total of 50 Linde Engineering employees were deployed on site. An integrated task force was built especially for this challenging project, bringing experts from Dresden together with employees from Unipetrol and technical experts from the insurance companies. “So we had all the necessary people with all the necessary expertise on board,” adds Kracht. By the time the project was completed, over 1,000 personnel had been deployed at the Unipetrol site.

The fact that no injuries were sustained during the entire ten-month reconstruction project is a source of great pride for the Linde expert, as is the fact that the work was completed ahead of schedule. It took ten months – from the damage assessment in September 2015 till July 2016 – for Linde to complete the mechanical work. Demolition of the four damaged furnaces and handover of the site in readiness for the new furnaces took place one month earlier than planned. Plant component repair work was also completed with one week to spare, which meant that Unipetrol was able to restart its ethylene plant operations in October 2016.

-workers at a refinery pipeline plant

Workers at a refinery plant

  • About Linde Engineering
  • Collaborate.Innovate.Deliver.
  • Collaborate.
  • Innovate.
  • Deliver.
Any questions or comments?
Contact us
More information
  • Polypropylene plants
  • Engineering defies permafrost
  • Petrochemical plants
  • Steamcracking technology
  • Petrochemical plants references
  • VIDEO: Watch also video from our logistic partner deugro
Press releases
  • Linde to manage on-site gas supply for Russian petrochemical company SIBUR
    •  
    • Sitemap
    • Terms of Use
    • Legal Notice
    • Data Protection
  • © The Linde Group 2018

To enhance your user experience and to deliver our online services, this website uses cookies for reasons of functionality, comfort and statistics. By continuing to browse the site, you are agreeing to our use of cookies.
You can find out more on our data protection information.
You must check the "I accept cookies from Linde Sites" box to accept.
More